上海市新杨工业园区
Road:A road system of chessboard—type network is adopted for internal traffic Within the area.There are al— together 7 main roads and Sec— ondary roads. Their total length is 5580 metres.Among them 3 are in the east-west di— rection,their Width are 20,24, 20 metres respectively.Other 4 are in the north-south direc— tion,their width 20,20,24,35 metres respectively.
EleCtric power:EleCtric power is sufficent.There are two 35kv transformer substa— tions and one 220kv substation transmitting electric power to the lndustrial Park.
Gas:A gas main witch has a diameter of 500 mm goes through the area and links with the gas network of the Whole City.
Communications: A tel— ephone exchange with a ca- pacity of 60,000 sets of tel— ephbnes.All the exchanges are under program control and transmission is digitized,pos- sessing functions of DDD and IDD and figures-data trans- mission.
Running water:Water supply is sufficient. The scope of water used in industry is 20,000 tons/day,water used in daily life is 10,000 tons/day.
Waste water:There is one pumping station for waste wa- ter treatment,daily treatment capacity 20,000 tons.
Rain:one pumping Station With a capacity of 12 cubic metres/sec.
 
   

     
Tel: 0086-021-66958856   66958888
Add:No.2888 Nada Rd.Shanghai    E-mail:xinyan◎shputuo.com